Shires Extra Long Lead Rope - Green

£7.25
In stock

Product details

The Shires Extra Long Lead Rope provides additional length for greater flexibility when leading, tying up, or carrying out groundwork. Read more

Measuring 3 metres, it is ideal for horses that require that extra space.

Made from durable, soft-feel braided rope for comfortable handling. Finished with a strong trigger clip for secure and reliable attachment to a headcollar.

  • 3m length for added reach and control
  • Soft-feel braided rope for comfort
  • Hardwearing and durable design
  • Secure trigger clip fastening
  • Available in a range of colours

A practical and versatile lead rope, suitable for everyday use.

Product Code: 0257670005002

Store Pickup

Finance Options

Size Guide

Horse Rugs

Bottom Measurement (Feet)3'9''4'0''4'3''4'6''4'9''5'0''5'3''5'6''5'9''6'0''6'3''6'6''6'9''7'0''7'3''
Bottom Measurement (Inches)45''48''51''54''57''60''63''66''69''72''75''78''81''84''87''
Back Measurement (cm)9095100105110115120125130135145150155165170

Turnout Rug Neck Compatibility
Neck SizeSMLXL
Rug Size4'6" - 5'0"5'3" - 5'9"6'0" - 6'6"6'9" - 7'3"

Horse Boot Fit Guide
Size GuideFrontHind
UP TO 13.1HHPonyPony
13.2HH - 14.1HHPonyCob
14.2HH - 15.1HHCobCob
14.255 - 15.1HH (with good bone)CobFull
15.2HH - 16.2HHFullFull
16.3HH +FullExtra Full

Over Reach Boot Fit Guide
Size Guide
UP TO 14.1HHPony
14.2HH - 15.1HHCob
15.2HH - 16.2HHFull
16.3HH +Extra Full
16.3HH (heavy)Extra Extra Full

Numnah Size Guide
Size15"-16.5"17"-18"
ABACK SPINE LENGTH48cm50cm
BDEPTH AT CENTER OF PATCH47cm51cm

Saddlecloth Size Guide
Size14"15"-16.5"17"-18"
ABACK SPINE LENGTH44cm49cm56cm
BDEPTH AT CENTER OF PATCH40cm46cm48cm

Fly Mask Size Guide
SizeABC
Extra Small Pony54cm77cm27cm
Small Pony59cm86cm28cm
Pony61cm89cm33cm
Cob66cm89cm34cm
Full68cm104cm36cm
Extra Full71cm107cm46cm

Cavesson & Flash Bridles
MiniSmall PonyPonyCobFullExtra Full
Head Measurement (bit ring to bit ring)65-8174-9480-9886-10993-11595-122
Browband (end to end)32.53537.54042.545
Throatlash (split to split)41-5645-6451-6960-8367-9171-94
Cheekpiece (include buckle)182122.5242526
Noseband (circumference)45-51.547.5-5550-5858-6462-7068-76
Flash (circumference)N/A39-4942-54.547-5752-6357-68

Mexican & Grackle Bridles
PonyCobFullExtra Full
Head Measurement (bit ring to bit ring)80-9886-10993-11595-122
Browband (end to end)37.54042.545
Throatlash (split to split)51-6960-8367-9171-94
Cheekpiece (include buckle)22.5242526
Jaw strap (ring to ring)21-28.524-3530.5-39.534-44
Long Buckle strap (include buckle)53596367
Long hole Strap length38.54347.552
Shires Extra Long Lead Rope - Green

Shires Extra Long Lead Rope - Green

£7.25

Christmas Gifts
from R&R Country

Extended Christmas returns until 8th January 2027See Refund Policy for details.