{"product_id":"shires-extra-long-lead-rope-red","title":"Shires Extra Long Lead Rope - Red","description":"\u003cdiv id=\"description\" class=\"data item content\" role=\"tabpanel\" aria-labelledby=\"tab-label-description\" data-role=\"content\" aria-hidden=\"false\"\u003e\u003cdiv class=\"product attribute description\"\u003e\u003cdiv class=\"value\"\u003e\n\u003cp data-start=\"138\" data-end=\"363\"\u003eThe Shires Extra Long Lead Rope provides additional length for greater flexibility when leading, tying up, or carrying out groundwork. Measuring 3 metres, it is ideal for horses that require that extra space.\u003c\/p\u003e\n\u003cp data-start=\"365\" data-end=\"520\"\u003eMade from durable, soft-feel braided rope for comfortable handling. Finished with a strong trigger clip for secure and reliable attachment to a headcollar.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli data-start=\"543\" data-end=\"582\"\u003e3m length for added reach and control\u003c\/li\u003e\n\u003cli data-start=\"543\" data-end=\"582\"\u003eSoft-feel braided rope for comfort\u003c\/li\u003e\n\u003cli data-start=\"543\" data-end=\"582\"\u003eHardwearing and durable design\u003c\/li\u003e\n\u003cli data-start=\"543\" data-end=\"582\"\u003eSecure trigger clip fastening\u003c\/li\u003e\n\u003cli data-start=\"543\" data-end=\"582\"\u003eAvailable in a range of colours\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp data-start=\"728\" data-end=\"791\"\u003eA practical and versatile lead rope, suitable for everyday use.\u003c\/p\u003e\n\u003c\/div\u003e\u003c\/div\u003e\u003c\/div\u003e\u003cdiv id=\"tab-label-washing-tab\" class=\"data item title\" tabindex=\"0\" role=\"tab\" data-role=\"collapsible\" data-collapsible=\"true\" aria-controls=\"washing-tab\" aria-selected=\"false\" aria-expanded=\"false\"\u003e\u003c\/div\u003e","brand":"Shires","offers":[{"title":"Default Title","offer_id":57906926387581,"sku":"0257670009002","price":7.25,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1235\/3552\/files\/22040_0.jpg?v=1780117811","url":"https:\/\/www.randrcountry.com\/products\/shires-extra-long-lead-rope-red","provider":"R\u0026R Country","version":"1.0","type":"link"}